AI VA KO'P MEZONLI QARORLAR INTEGRATSIYASIDA LOYIHA PORTFELINI OPTIMALLASHTIRISH: AHP–TOPSIS–KNAPSACK–LLM GIBRID MODELI

Authors

  • Shamsiyev Azizbek Rafiq o'g'li Raqamli iqtisodiyot va agrotexnologiyalar universiteti, magistrant

Keywords:

loyiha portfeli, optimallashtirish, AHP, TOPSIS, 0/1 Knapsack, katta til modeli, GPT-4o, ko'p mezonli qaror qabul qilish, sun'iy intellekt, dynamic programming.

Abstract

Mazkur maqolada loyiha portfelini optimallashtirish masalasini hal qilish uchun sun'iy intellekt (LLM) va ko'p mezonli qaror qabul qilish (MCDM) metodlarini birlashtiruvchi yangi gibrid model taklif etiladi. Model to'rt komponentdan iborat: AHP — mezon og'irliklarini topish; TOPSIS — alternativlarni tartiblash; 0/1 Knapsack dynamic programming — byudjet konstrainti ostida optimal portfel tanlash; GPT-4o asosidagi LLM-scoring — loyiha hujjatlaridan miqdoriy ball olish. Pipeline-ning matematik apparati, hisoblash murakkabligi O(n·m + n·B) va Design Science Research paradigmasiga muvofiq eksperimental dizayni keltirildi. 20 ta sintetik loyihada 30 marta o'tkazilishi rejalashtirilgan eksperimentlar va to'rtta tekshiriladigan gipoteza (H1–H4) tasniflandi. Tadqiqotning ilmiy yangiligi shundaki, AHP+TOPSIS+0/1 Knapsack+LLM ning to'rt komponentli integratsiyalashgan pipeline-i dunyo amaliyotida birinchi marta yagona ko'rinishda rasmiylashtirilmoqda.

References

Archer, N. P., & Ghasemzadeh, F. (1999). An integrated framework for project portfolio selection. International Journal of Project Management, 17(4), 207–216.

Bellman, R. (1957). Dynamic programming. Princeton University Press.

Brown, T. B., Mann, B., Ryder, N., et al. (2020). Language models are few-shot learners. Advances in Neural Information Processing Systems, 33, 1877–1901.

Chen, Y., Liu, X., & Wang, Z. (2023). AI-augmented decision support for project selection using large language models. Decision Support Systems, 165, 113876.

Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (2001). Portfolio management for new products (2nd ed.). Basic Books.

Ferreira, L., Borenstein, D., & Vergara, S. S. (2022). A hybrid approach to project portfolio selection using AI and multi-objective optimization. International Journal of Production Economics, 245, 108412.

Hevner, A. R., March, S. T., Park, J., & Ram, S. (2004). Design science in information systems research. MIS Quarterly, 28(1), 75–105.

Hsu, C. C., Chen, C. Y., & Hung, K. C. (2021). Application of recurrent neural networks in R&D project portfolio optimization. Expert Systems with Applications, 168, 114347.

Hwang, C. L., & Yoon, K. (1981). Multiple attribute decision making: Methods and applications. Springer-Verlag.

Kahneman, D., & Tversky, A. (1979). Prospect theory: An analysis of decision under risk. Econometrica, 47(2), 263–291.

KPMG. (2023). Global IT project management survey 2023. KPMG International.

Markowitz, H. (1952). Portfolio selection. The Journal of Finance, 7(1), 77–91.

Martello, S., & Toth, P. (1990). Knapsack problems: Algorithms and computer implementations. John Wiley & Sons.

Popper, K. R. (1959). The logic of scientific discovery. Hutchinson.

Project Management Institute. (2017). The standard for portfolio management (4th ed.). PMI Inc.

Saaty, T. L. (1980). The analytic hierarchy process. McGraw-Hill.

Sohrabi, M., Vanani, I. R., Tagheighati, A., & Amouzegar, S. (2020). A bibliometric analysis of artificial intelligence applications in project management. International Journal of Project Management, 38(8), 459–472.

Standish Group. (2020). CHAOS Report 2020: Beyond infinity. The Standish Group International.

Tian, G., Yang, K., & Cui, Z. (2018). Hybrid AHP-TOPSIS approach for project selection in energy sector. Energy Procedia, 152, 1029–1034.

Downloads

Published

2026-05-14